Quantcast
Channel: VMware Communities: Message List
Viewing all articles
Browse latest Browse all 231887

Re: Multipath Design with 5 hosts and 3 MD3000i Storage

$
0
0

Hi,

 

 

2 nics by subnet is sufficient, so remove the third card . And add a redundancy to your mgmt, vmotion and production network. DEV / Network is less important that production network. But in your diagram, DEV network have a redundancy.

And then merge your vswitch 0/5/6. You will use explicit failover configuration for your vmnic on your port group.

 

 

Last thing: Your configuration is not the same on all your hosts. So please do the same, i see on your host vmware 5 , vswitch 6 is used for production and on vmware 3 it is vswitch 5. You need the same configuration,if not your HA and DRS will not work.

Regards,

Julien.


Viewing all articles
Browse latest Browse all 231887

Trending Articles